FörderungEuropean Commission

Advanced TSO control rooms to enhance grid observability, stability and resilience

Über diese Ausschreibung

Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, and efficiency of electricity transmission grids. Grid congestion is managed efficiently; Enhanced observability of grids and improved forecasting of supply, demand, grid capacity availability, and flexibility; Transmission system operators (TSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with other TSOs; Vendor-agnostic reference architectures, solutions and tools are developed…

Quelle

Diese Angaben stammen von ec.europa.eu. Prüfen Sie dort die Teilnahmevoraussetzungen und die Frist, bevor Sie sich bewerben.